DRY INSTALLATION 

The dry installation allows for the positioning of the slabs directly onto substrates in grass, gravel or sand to create pedestrian pathways that can be immediately walked upon. Easy and quick, this type of application does not require the use of adhesive or the intervention of specialised laying technicians.  

RAISED INSTALLATION

The raised installation for outdoor application allows for the creation of a technical gap of variable height between the substrate and the foot plan. It can be replaced and inspected at any time without damaging the surface and allows irrigation systems, pipes and lighting systems to be concealed.

TRADITIONAL ADHESIVE INSTALLATION

The traditional adhesive installation onto screed guarantees an excellent breakage load thanks to the performance of 20mm thickness ceramics. This installation method represents the perfect solution for carriageable and cycle lanes. 

WARNING INSTALLED LASTRA 20mm >>

  • DRY INSTALLATION: GRASS OR GROUND

    For the correct installation of LASTRA 20mm onto grass or ground, such as with pathways, it is always recommended to check that the foot plan is at the same level of the grass. It is recommended to follow the instructions below: 1.     PREPARATION OF THE SUBSTRATE Remove as much of the grass as possible from […]

  • DRY INSTALLATION: GRAVEL

    DRY INSTALLATION: GRAVEL ONTO GROUND For the correct installation of LASTRA 20mm on gravel onto ground, in case of concentrated loads (gazebos, flower vases, masonry barbecues, sofas, garden umbrellas, etc.), it is recommended to follow the instructions below: 1.     PREPARATION OF THE SUBSTRATE Dig the substrate for 20cm; 2.     DRAINING LAYER Prepare a layer of […]

  • RAISED INSTALLATION

    For the correct raised installation of LASTRA 20mm, in case of flat surfaces, it is recommended to follow the instructions below: 1.     PREPARATION OF THE SUBSTRATE AND INSTALLATION BED Prepare a screed with inclination of 2% above the floor and apply a water-proofing layer to it. Spread a draining sheath allowing for the correct drainage […]

  • TRADITIONAL ADHESIVE INSTALLATION

    For the correct adhesive installation of LASTRA 20mm, it is recommended to follow the instructions below: 1.     PREPARATION OF THE SUBSTRATE Prepare a layer of 10cm made up gravel and pebbles with 16-35mm granulomewww. Carry out a concrete bed with minimum thickness of 15-20cm and minimum inclination of 2%; 2.     BASE INSTALLATION Spread a reinforcement […]